Monday, March 18, 2013

Revit HotFix for 2012

Recently people reported a Windows update causing the blue annotation symbols and temporary dimensions to change their color in Revit 2012 versions. I saw it too. Autodesk has release a hotfix to resolve the .net version issue that created the situation in the first place. The Revit Clinic wrote about the hotfix earlier today. You can go to the site to check out the ReadME file and download the HOT FIX HERE.

Friday, March 15, 2013

Show Me Wish

Revit offers us the opportunity to "Show" an element when we review warnings, use the Select by ID and fairly often when an error message is generated and we expand the warning.



Choosing Show will often generate a warning that there is no good view to show it in and ask us if we really want to let Revit hunt for a view.



I'd like to be able to specify which kind of views to hunt through before it does its magic. For example I know I want to find a ceiling so don't bother showing me 3D, elevation or section views if I'm really hoping to see just ceiling plan views. Perhaps a new Zoom option: Zoom to Selected that goes to the current element in the view, like Revit will do in a 3D view using the view cube.

Let me help Revit focus on what I'm interested in or think I need. I occasionally have a clue...

Thursday, March 14, 2013

Concealing Your Workset Username

Luke recently wrote a post mentioning a technique that AUGI member Navid offered to help lock down certain worksets. We can use a special username like Super Admin to be the owner of a workset to prevent other users from randomly altering the elements assigned to it. The tip offered involves creating a username with a symbol only font which leaves us with a meaningless username that we can't read or pretend we are. In his instructions he takes the username into Microsoft Word and changes the font. He then pastes the newly "encrypted" username into the Revit username parameter (Application menu > Options Dialog).

I'm not sure it is necessary or even good idea if we felt it was necessary. Nevertheless it is possible and there might be a circumstance someday (maybe a troubleshooting issue) where it will come in handy. Filing this in the "someday, but hopefully not" folder. Somewhere Dick Dastardly's dog Mutley is swearing...

Wednesday, March 13, 2013

Revit MEP Heating and Cooling Loads Results

I received an email from a Revit MEP user asking about results that don't seem to make sense. I'm writing about this because after some experimentation it seems odd to me too. This doesn't involve a complex model, just a simple test they did using a single room. I attempted to mimic their emailed explanation fully realizing that there are myriad possible things I could do differently. Despite the possible variables I was able to reproduce what they were concerned about.

Still Curious?

When they set up a test and then changed one variable (Outdoor Air) the resulting report shifts peak cooling month by one month (their result).

These are the test conditions: Walls surrounding a Space such that it is 100 SF. I placed a floor, ceiling and roof but I don't know that they did that. I used these settings for Occupancy, lighting and power.


These are the energy settings I used for the first report.


These are the energy settings I altered for the second report, only changed the Outdoor Air setting, nothing else.


These are the two reports side by side. Report on the left is the one without Outdoor Air changes and the one on the right is after changing Outdoor Air. Notice the two month advance? There are also subtle Dry and Wet Bulb values.


Their question to me and mine now as well is, "Is it reasonable to expect a so called simple change like this would cause such a jump in the calculation time frame?" I've recommended they reach out to the Autodesk Revit support team so they can examine their dataset first hand. Seems odd to me though.

I should also mention that I changed the Outdoor Air for both the Zone that the space belongs to and the Energy Settings dialog. I didn't seem to matter when I tried changing only one of those for the Outdoor Air.

Comments?? Did I miss something obvious?

Tuesday, March 12, 2013

Blends have Two Sketches

From the been there done that department I bring you a little reminder, Solid and Void blends have two sketches; a base and a top. It's pretty common to see two sketches in the base and the user wonders why they can't move on to the top sketch. When the blend process starts Revit is thinking "base", regardless of the orientation of the blend you are making. How can you tell? Easy, there is a button for Edit Top.


That can only be appropriate if Revit thinks we are working on the base. There isn't even a button for Edit Base until after you click Edit Top.


Once you have two complete sketches, each in their own "world" (Base and Top), you can Click the Green Check mark for Finish Edit Mode. If you need to revisit one or both of the sketches you'll find you can go straight to the Base or Top Sketch via separate buttons, just have to select the form first.



Remember, two sketches, two, two are better than one or twice as nice.

Monday, March 11, 2013

Closing Worksets with Specify

When you open a Revit project that uses Worksets there is an option to specify which worksets you want to open before Revit goes to the trouble of fulling opening the project. Very handy for big projects, crucial even.



I have occasionally encountered a situation where Revit won't let me open a project with all the worksets closed at first. Why do that? It is the fastest way to get a project open. Sometimes you need to do something like swap out titleblocks. If you load even some of the actual model it will take longer to open sheet views. If what you are doing doesn't depend on seeing the model in the views it is much faster to close the worksets first and the carry out your work.

When this has happened the Open button gets diasabled. If I open at least one workset it becomes enabled again. Revit seems to really want one workset open at least in some files and for others it doesn't care. No, I have no idea why it is fussy about it.

Sunday, March 10, 2013

Reference Plane Order

This is subtle. When you draw reference planes the order they were created plays a role in how a parameter will move them later. Draw two new vertical parallel reference planes, draw one on the left and then next to the right of the first. Add a dimensions and assign a label (parameter) to the dimensions. Flex the parameter value and watch the reference plane on the right move. If you have a lot of reference planes it can get confusing but this underlying behavior is lurking there.

You can force certain behavior by pinning reference planes, locking dimension or using the EQ constraint to force them to move equally about a center reference line. Like I wrote, it is subtle. Just keep it in mind while you do your family editing.